Details: solid waste management setting up an integrated solid waste processing facility as per msw (m&h) rules 2016, of 5 tpd capacity on design, built, operate and transfer (dbot) basis of latest technology for a period of 10 years note: 1. the bidder must quote the charges considering the cost of installation of machinery, operation and maintenance for a minimum period of 10 years2. gst as applicable will be paid extra
Sector: University