Details: demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge: in cement mortar demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) :15.8.3 from brick work in cement mortar earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil : cement concrete (cast-in-situ) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and
Sector: University