The Western Coalfields Limited has published a tender for "Shifting of checkpost, rest shelter, overhead tank and foundation for boom barrier at new site of Singhori OCM under BSSA." on the 27 Jan 2026. This tender belongs to Boom barriers category. This tender is published in Nagpur, Maharashtra location. The vendors interested in this tender and related Boom barriers tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: access control system Tenders | boom barriers Tenders | road furniture Tenders
Related categories: Airport signaling systems Tenders | Railway signaling system Tenders | Railway signalling cable Tenders |
In Nagpur district, Maharashtra, a total of 2 Boom barriers tenders have been published, with
| Tender Title | Shifting of checkpost, rest shelter, overhead tank and foundation for boom barrier at new site of Singhori OCM under BSSA. |
|---|---|
| Tender Description | earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil. supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of enginee |
| Comments | earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil. supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of enginee |
| Published Date | |
|---|---|
| Due Date | 10 Feb 2026 00:00:00 |
| Estimated Value | 15.86 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |