Details: providing and fixing steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per directions of engineer-in-charge including cost and conveyance of all materials, loading and unloading charges, labour charges etc., with all lead and lift as per specifications etc.,, and hire charges of machineries for cutting, welding, grinding and equipments, with all lead and lift, transportation, etc., complete as per specification;providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by engineer-in-charge) 0.50 mm (+0.05 %) total coated thickness with zinc coating 120 g/m2 as per is: 277,in 240 mpa steel grade, 5-7 microns epox
Sector: University