Details: note (applicable for all items):- the bidders/contractors are advised to read tender document & all corrigendum/ amendments and general conditions of contracts before entrying/quoting the rates.schedule 'a' surface dressing not exceeding 15 cm deep in soft/loose soil complete all as specified and directed. excavating in post holes (or similar holes) each n exc 0.5 , getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm, watering, and removing surplus soil to a distance n exc 50 m and making good surface complete all as specified and directed excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth for foundation etc. or for shafts, wells, cess pits, manholes, pier holes etc. not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out as in hard/dense soil complete all as specified and directed. returning, filling in, including spreading, levelling, watering and well rammi
Sector: Defense