The Military Engineer Services has published a tender for "Construction of FSB over Lamang" on the 03 Nov 2025. This tender belongs to Bridge Construction category. This tender is published in Papum Pare, Arunachal Pradesh location. The vendors interested in this tender and related Bridge Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: bridges Tenders | all civil works Tenders | construction of bridge Tenders
Related categories: Airport Runway Tenders | Barrage cum Bridge Tenders | Airport Runway Repair Tenders |
MES issued 96 tenders for Bridge Construction last year
With, 4 floated just last month.
| Tender Title | Construction of FSB over Lamang |
|---|---|
| Tender Description | excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (a) ordinary soil. a manual means (depth upto 3 m) pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and (a) m20 (1 cement: 1.5 coarse sand: 3 stone aggregate 20 mm nominal size) reinforced concrete work in columns, pillars, post and |
| Comments | excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (a) ordinary soil. a manual means (depth upto 3 m) pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and (a) m20 (1 cement: 1.5 coarse sand: 3 stone aggregate 20 mm nominal size) reinforced concrete work in columns, pillars, post and |
| Published Date | |
|---|---|
| Due Date | 13 Nov 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |