Details: excavation in trenches in hard & dense of soil n.exc 1.50m wide and n. exc 1.50m in depth for foundation of pole/stay and laying of ug cable and other and getting out complete all as specified and directed. removal of excavated (soil) material to a distance not exceeding 50m and depositing where directed at a level not exc. 1.5m above the starting point complete all as specified and directed. returning, filling in, including spereading, leveling, watering and well ramming in layers not exc 25cm thick each complete all as specified and directed. m&l for cutting existing road/hard standing not exc 45 x 45 cm in wide & depth getting out excavated material for laying cable/gi tube, returning filling & well rammaing watering finish suraface 10 cm from top using pcc 1:2:4; including removal of surplase soil complete all as specified and directed. supply and laying for 25 mm bore dia of galvanised iron tubing "medium grade" laid in trench, walls and ceilings or laid in floors with all