Details: surface excavation in hard/dense soil not exceeding 30cm deep and averaging 15cm deep and getting out complete including removal to distance exceeding 250m but not exceeding 1000m all as specified and directed. excavating in post holes (or similar holes) each not exc 0.5 , getting out, returning, filling in and ramming earth, in layers not exceeding 25 cm, watering and well ramming, removing surplus soil not exc.50m in soft/ loose soil, complete all as specified and directed. excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in any kind of soil ,complete all as specified and directednote : manual excavation to be done. during excavation if any damage occured to existing cable any type/ water pipe line, it will be contractor responsibilty to get it repair and make functional by providing jointing kit etc without any extra cost.
Sector: Defense