Description: Drawing Additional Circuit 11 kV OH Line with ABC 150 sq mm using PSC Poles 4 km and drawing Additional Circuit 11kV OH Line with ABC 120 sq mm using PSC Poles 0 5 km under Electrical Section Mannarkkad Name of Work ADDITIONAL 11 KV FEEDER USING HT ABC 150 SQMM CW 6520 202324 66 under Electrical Section Mannarkkad
Details: Erection of Anchor clamp / dead end clamp for 11kV ABC of any size Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Sector: Power Sector