Details: civil works dismantling of rcc of any thickness in the column and clearing away the debris from the foundation for initial lead and lifts etc., complete as directed by the engineer,i/c., dismantling the pressed tiles and weathering course of any thickness and clearing the debris from site with initial lead and lifts etc., complete as directed by the engineer,i/c., removing the damaged gi sheet roofing without roof timberis and handed over to the department as directed by the engineer,i/c., supplying and erecting steel centering for sides and soffits including supports and strutting up to a height of 3.29m meter for plain surfaces such as rcc slabs, beams tee or ell beams, lintels staircases beams etc., with all cross bracings using mild steel b.g. 10 sheets of size 90cm x 60cm stiffened with welded mild steel angles of size 25mm x 25mm x 3mm laid over silver oak (country wood) joists of size 10cm x 6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to
Sector: University