Description: ECHP-I- Attending breakdown work, maintenance of pull chord switches , magnetic separators and lighting works in all Conveyors at Primary Crusher House-I and Secondary Crusher House-I.--Name of Work: <ECHP-I- Attending breakdown work, maintenance of pull chord switches , magnetic separators and lighting works in all Conveyors at Primary Crusher House-I and Secondary Crusher House-I >
Details: ELEC MTNCE WORKS IN CONVRS,PCH I&SCH I Charges for Removing the top cover, cleaning all inside the pull chord switch, checking the terminal tightness, refixing to all in the original position. Cleaning the terminal and contactors inside the magnetic separator in all responds and tightness checking of all components. Maintenance of lighting equipments. Charges for removal of carbon dust deposion in the lighting accessories like MCB/LDBs light fittings tightness, checking of all lighting cable & wires in the conveyors 17,19,45,46,43,47, 62, Reject conveyor-I, SCH-I (7 flours), PCH-I (5 flours,) JT-5(4 flours), Paddle feeder, SS-III switch gear room & control room, 120Ton & 40 Ton weigh bridge with its street lights-10 Nos., flood light tower -1 No. and high mast light -1 No.
Sector: Power Sector