Description: ECHP-I- Attending Breakdown, Preventive mechanical maintenance works in Conveyor-14,15 and 16.--Name of Work: < ECHP-I- Attending preventive, breakdown mechanical maintenance works in Conveyor-,14,15 & 16. >
Details: PREV MECHL MTNCE IN CONVR 14,15,16 Charges for clearing the spillage coal on walkways, return side under belt to the entire length of the Conveyor deck sheet, head end, tail end of the Conveyor-14,15 and 16 including hire charges for T&Ps cost of consumables, etc., complete. Charges for assisting work for providing belt joint in Conveyors-14,15, and 16,including arresting the belt by providing clamps, lifting the counter weight, dismantling the idlers and idler frames and skirt board assembly and refixing the same after vulcanizing the joint, including T&P hire charges and cost of consumables etc., complete. Charges for assisting work for pulley lagging works in Conveyors-14,15 and 16 including arresting the conveyor belt, lifting the counter weight and normalizing the system after pulley lagging trial operation including T&P hire charges and cost of consumables, safety appliances etc., complete Charges for overhauling and inspection of gear coupling in Conveyors-14,15 and
Sector: Power Sector