Details: part i (parking lot) embankment construction with material obtained from borrow pits (construction of embankment with approved material having cbr>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 ) granular sub-base with well graded material (cbr>30 or more) (table:- 400-1 & table 400-2) construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having cbr >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at omc, and compacting with vibratory rollers of 80 to 100 kn static weight to achieve the desired density, complete as per clause 401 of specification. for grading- i material granular sub-base with well graded material (cbr>30 or more) (table:- 400-1 & table 400-2) construction of granular sub-base by providing well g
Sector: Mining