The South Eastern Coalfields Limited has published a tender for "Construction of 32 nos RCC sectionalization stopping to isolate development panel in Seam-C (30Nos) and Seam D (02Nos)at Bijuri Colliery of Hasdeo Area" on the 19 Sep 2025. This tender belongs to Sectional Stopping category. This tender is published in Korba, Chhattisgarh location. The vendors interested in this tender and related Sectional Stopping tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: non residential buildings Tenders | all civil works Tenders | industrial buildings Tenders
Related categories: Chemical Plant Construction Tenders | FGD System Tenders | Chemical Plant Repair Tenders |
In Korba district, Chhattisgarh, a total of 13 Sectional Stopping tenders have been published, with 1 tenders released last month.
Tender Title | Construction of 32 nos RCC sectionalization stopping to isolate development panel in Seam-C (30Nos) and Seam D (02Nos)at Bijuri Colliery of Hasdeo Area |
---|---|
Tender Description | 1 malma cleaning, removal of debries from galleries, sumps,tail ends of belt conveyor, and stacking within 50m lead groove cutting in hard stone by chisel and hammer(roof and floor) groove cutting in coal(sides) by chisel and hammer groove cutting in both side in hard stone by chisel and hammerin seam-d drift rcc work in u.g. including centering & shuttering, reinforcement for rcc work including cutting, bending, placing in position and binding shuttering etc., all complete ratio 1:2:4 12 mm thick cement /lime plastering ratio of 1:6 up to 5 meter and above in u.g. white washing without material b) double coat. loading of materials in tub at incline mouth (all items of building materials). unloading of all kinds of building materials at destination u/g. lead for transportation of materials by manual labour side dressing of coal in seam c side dressing of hard stone in seam c roof dressing of hard stone in seam-c cement sand stone chips steel lime total impact of gst for the pur |
Comments | 1 malma cleaning, removal of debries from galleries, sumps,tail ends of belt conveyor, and stacking within 50m lead groove cutting in hard stone by chisel and hammer(roof and floor) groove cutting in coal(sides) by chisel and hammer groove cutting in both side in hard stone by chisel and hammerin seam-d drift rcc work in u.g. including centering & shuttering, reinforcement for rcc work including cutting, bending, placing in position and binding shuttering etc., all complete ratio 1:2:4 12 mm thick cement /lime plastering ratio of 1:6 up to 5 meter and above in u.g. white washing without material b) double coat. loading of materials in tub at incline mouth (all items of building materials). unloading of all kinds of building materials at destination u/g. lead for transportation of materials by manual labour side dressing of coal in seam c side dressing of hard stone in seam c roof dressing of hard stone in seam-c cement sand stone chips steel lime total impact of gst for the pur |
Published Date | |
---|---|
Due Date | 11 Oct 2025 00:00:00 |
Estimated Value | 1.05 Crore |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |