Details: labour rate for steel work welded in build up section /framed work ,including cutting ,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc.as required. dismantling steel work in build up section in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting , rivets, welding etc. including dismembering and stacking with in 50 meters lead. total impact of gst for the purpose of ctc
Sector: Mining