The Central Coalfields Limited has published a tender for "New making of foundation for installation of OCB Switch 11KV, 400 A for 300 KVA, 3.3KV/440Volt transformer installed at Islam Gali including installed of GOAB Switch 400 Amp, 3.3 KV with test certificate and other necessary work at Jhirkey village un" on the 13 Mar 2026. This tender belongs to Power Line Maintenance category. This tender is published in Bokaro, Jharkhand location. The vendors interested in this tender and related Power Line Maintenance tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: electrical power line maintenance Tenders | electric meter boxes Tenders | all power line work Tenders
Related categories: Lighting installation services Tenders | High Mast Light Tenders | Street Light Installation Tenders |
CCL issued 555 tenders for Power Line Maintenance last year
With, 6 floated just last month.
| Tender Title | New making of foundation for installation of OCB Switch 11KV, 400 A for 300 KVA, 3.3KV/440Volt transformer installed at Islam Gali including installed of GOAB Switch 400 Amp, 3.3 KV with test certificate and other necessary work at Jhirkey village un |
|---|---|
| Tender Description | earth work in excv. by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5min width or 10sqm on plan) incl. dressing of sides and ramming ofbottom lift lupto1.5m incl. getting out the exev. soil and disposal ofsurplus soil as dir.within a lead of 50m all kind of soil. supplying and filling in plinth with jamuna sand under floors incl. watering, ramming consolidating and dressing complete. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level: 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). maintenance less earth resistance of chemical ratty pit (a) latest technology for sandy region). i) safe earthing electrode having two custom made g.i tubes (galvanized 80 microns, minimum) one side the other of length 2 mtrs. (outer dia 80mm) field the conductor rich crystalline mixture (ccm) =01 no. x 11932.00 ii) back fill co |
| Comments | earth work in excv. by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5min width or 10sqm on plan) incl. dressing of sides and ramming ofbottom lift lupto1.5m incl. getting out the exev. soil and disposal ofsurplus soil as dir.within a lead of 50m all kind of soil. supplying and filling in plinth with jamuna sand under floors incl. watering, ramming consolidating and dressing complete. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level: 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). maintenance less earth resistance of chemical ratty pit (a) latest technology for sandy region). i) safe earthing electrode having two custom made g.i tubes (galvanized 80 microns, minimum) one side the other of length 2 mtrs. (outer dia 80mm) field the conductor rich crystalline mixture (ccm) =01 no. x 11932.00 ii) back fill co |
| Published Date | |
|---|---|
| Due Date | 23 Mar 2026 00:00:00 |
| Estimated Value | 3.89 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |