The Bharat Coking Coal Limited has published a tender for "Shifting, Installation of 4000 GPM, pump motor set slong with all electrical sand 10 dia, delivery pipe line of Bhowra South Colliery Approx length 670 Mtr." on the 02 Dec 2025. This tender belongs to Machinery Shifting category. This tender is published in Dhanbad, Jharkhand location. The vendors interested in this tender and related Machinery Shifting tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: machines Tenders | floor sawing services Tenders | chute installation Tenders
Related categories: Goods Shifting and Transportation Tenders | Industrial Oil Filtration Tenders | Power Plant Control System Repair Tenders |
In Dhanbad district, Jharkhand, a total of 91 Machinery Shifting tenders have been published, with 2 tenders released last month.
| Tender Title | Shifting, Installation of 4000 GPM, pump motor set slong with all electrical sand 10 dia, delivery pipe line of Bhowra South Colliery Approx length 670 Mtr. |
|---|---|
| Tender Description | manpower deployed for dismantling 10" dia of m.s. pipe line 670 meters. manpower deployed for manual carrying & lying & transporting of 10" dia of m.s. pipe line 670 meters. fitting the same pipe line of 10" dia of m.s. pipe line 670 meters. bolt & nut 5/8 x 3" m.s washer 5/8" m.s 10" m.s band 10" trench cutting and lying of pipe 2 sets highly skilled = 1 person x 18 days skilled= 3 person x 18 days total impact of gst for the purpose of ctc |
| Comments | manpower deployed for dismantling 10" dia of m.s. pipe line 670 meters. manpower deployed for manual carrying & lying & transporting of 10" dia of m.s. pipe line 670 meters. fitting the same pipe line of 10" dia of m.s. pipe line 670 meters. bolt & nut 5/8 x 3" m.s washer 5/8" m.s 10" m.s band 10" trench cutting and lying of pipe 2 sets highly skilled = 1 person x 18 days skilled= 3 person x 18 days total impact of gst for the purpose of ctc |
| Published Date | |
|---|---|
| Due Date | 01 Dec 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |