The Northern Coalfields Limited has published a tender for "Installation Dismantling and Shifting of PumpMotorPontoonStarter Field Switches Pipelines flexible andor MS andor GI etc Cables Hoses along with all other related accessories before andor During Monsoon 2026 as and when required for monso" on the 02 Mar 2026. This tender belongs to Pipe Laying category. This tender is published in Sonbhadra, Uttar Pradesh location. The vendors interested in this tender and related Pipe Laying tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: pipe laying Tenders | water pipe laying Tenders | pipe laying services Tenders
Related categories: Airport Runway Tenders | Airport Runway Repair Tenders | Road Paving Tenders |
Uttar Pradesh has published 6,610 tenders in Pipe Laying in the last financial year.
Out of these, 402 were published last month.
| Tender Title | Installation Dismantling and Shifting of PumpMotorPontoonStarter Field Switches Pipelines flexible andor MS andor GI etc Cables Hoses along with all other related accessories before andor During Monsoon 2026 as and when required for monso |
|---|---|
| Tender Description | installation and shifting, loading/ unloading of pump-motor-pontoon-starter-field switches-pipelines (flexible and/or ms and/or gi etc)- cables- hoses along with all other accessories and alignment of pump-motor set before or during monsoon as and when required for monsoon 2026 as per instructions of eic. note: the bidder will quote rate inclusive of tools and tackles charge and contractor profit. dismantling and shifting, loading/unloading of pump-motor-pontoon-starter-field switches-pipelines (flexible and/or ms and/or gi etc) - cables- hoses along with all other accessories before or during monsoon as and when required for monsoon 2026 as per instruction of eic. note: the bidder will quote rate inclusive of tools and tackles charge and contractor profit. total impact of gst for the purpose of ctc |
| Comments | installation and shifting, loading/ unloading of pump-motor-pontoon-starter-field switches-pipelines (flexible and/or ms and/or gi etc)- cables- hoses along with all other accessories and alignment of pump-motor set before or during monsoon as and when required for monsoon 2026 as per instructions of eic. note: the bidder will quote rate inclusive of tools and tackles charge and contractor profit. dismantling and shifting, loading/unloading of pump-motor-pontoon-starter-field switches-pipelines (flexible and/or ms and/or gi etc) - cables- hoses along with all other accessories before or during monsoon as and when required for monsoon 2026 as per instruction of eic. note: the bidder will quote rate inclusive of tools and tackles charge and contractor profit. total impact of gst for the purpose of ctc |
| Published Date | |
|---|---|
| Due Date | 13 Mar 2026 00:00:00 |
| Estimated Value | 1.62 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |