Description: Annual Rate Contract for Civil Maintenance Work Name of Work Annual Rate Contract for Civil Maintenance Work
Details: Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 meter in width as well as 10 Sqm on plan including disposal of excavated earth up to 50 mtr. and lift up to 1.5 mtr. disposed soil to be levelled and neatly dressed : All kinds of soil Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with ½ tonne roller, or stone or steel rammers and rolling every 3rd and top-most layer with power roller of minimum 8-10 tonne capacity and dressing up in embankment for roads, flood banks marginal banks and guide banks or filling up ground depressions, lead up to 50 mtr. and lift up to 1.5 mtr. All kinds of soil Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m, disposed earth to be levelled and neatly dress
Sector: University