Details: item description/ heading 50hp 550v rana make endless haulage complete set with electrical dismantling at no-2 inc west site 7r/1l site and loading on trolley lifting the all materials from ug 7r/1l to no-2 inc surface and transporting the same up to sankalpa khani surface by departmental truck and unloading the same. loading the same materials on trolley at sankalpa khani surface and lowering at underground and transporting up to 24d/21-22l 1400 mtr x 22mm haulage rope transporting from colliery store to sankalpa khani surface and loading on coal tub and lowering up to underground and laying the same rope from 24d/21-22l to 24d/46l rvil seam and splicing the same. placed all the haulege materials at 24d/21-22l site and install the same and start the haulage. 1(one) 40hp 550v voidrum make direct haulage complete set with electrical starter, switch etc dismantling at 7d/1l rvii seam of no-8 pit loading the all materials with electrical and 100mtr x 35 sqmm pvc armmourd cable on coal tub
Sector: Mining