Details: excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5mtr in depth and getting out in soft / loose soil for laying of under ground cable complete all as specified and directed. returning filling in including spreading leveling watering and well ramming in layers not exceeding 25cm in soft/loose soil complete all as specified and directed. removing of surplus soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed. materials and labour for boring for passing gi protection pipe up to 80 mm bore (dia) under road / footpath without disturbing the top surface complete all as specified and directed note-necessary infrastructure required for boring shall by arranged by the contractor and cost of the same included in quoted rates. taking down / out un-serviceable or serviceable lt ug cables of size 150 sqmm 3.5 core and connections including bricks, gi pipes, etc. of
Sector: Defense