Details: excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits,manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. excavating in trenches exc1.5m but not exc 3.0m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n.exc 10sqm on plan and n.exc 1.5m in depth and getting out. in soft/loose soil complete all as specified and directed. returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. removing excavated material (soil) n exc 50m and depositing where directed at a level n exc 1.5m above the starting point complete all as specified and directed. m&l for cement concrete 1:4:8 type d2,using 40mm graded stone aggregate as in foundations filling and mass concrete complete all as specified and directed. m&l for
Sector: Defense