Details: item description/ heading increasing the delivery range of the turbine pump, 1st pump with change in water level increasing the delivery range of the turbine pump, 2nd pump with change in water level increasing the delivery range of the turbine pump, 3 rd pump with change in water level increasing the delivery range of the turbine pump, 4th pump with change in water level doing the above job for the above mentioned mentioned pump subsequently as the water level changes further in the coming weeks and months changing of delivery flexible double armoured hose pipe of the above mentioned pumps as and when required, and replacing them with new hose pipes which has to be transported from the surface store area to the pump working site whenever they are available dismantling of pump 2, making way by removing the delivery range, lifting of pump no.2 from the site, transporting it to the kajora area workshop for necessary repairing reparing of pump no. 02 transporting of repaired pump no. 02.
Sector: Mining