Details: item description cost of primary wire (barre conductor) new to be required (incl.profit@10%) cost of secondary wire (barre conductor) (incl.profit@10%) less scrape value of old conductor cost of re-insulation of new conductor tpc (incl.profit@10%) repairing of complete set tap changer (incl.profit@10%) studs with insulator have damaged & requires changing (incl.profit@10%) supply of insulation like prespond, varnish, etc. (incl.profit@10%) de-tanking the coil from tank (incl.profit@10%) re-tanking the coil in tank (incl.profit@10%) core cleaning (incl.profit@10%) assembling the coil (incl.profit@10%) heating and testing the coil (incl.profit@10%) labour charges for doing the job (incl.profit@10%) oil filtration transporting charges total impact of gst for the purpose of ctc
Sector: Mining