Details: item description/ heading dismentaling of tugger haulage from old section in rviia completely and loading in tubs for transportation at 3 no. pit transportation of all haulage materials including motor, drum, bed plate, starter, cablesfrom one place to haulage installation place via surface and then lowering through 4no. pit installation of haulage plateform, by installing holding bolts, then installation of drums, motor, haulage rope, layout of cables from source to haulage installation site, etc installation and commissioning the haulage and trial after rope laying. provoding the consumable materials like nut-bolts, gas and welding electrodes for the installation of haulages as required total impact of gst for the purpose of ctc
Sector: Mining