Details: sch 'a' part-i (earth work & site development ) note: excavation & earh work included under this part and shall be measured for all parts) excavation over area n.exc 1.5 m deep and getting out, in hard/dense soil complete all as specified and as directed. excavation over area n.exc 1.5 m deep and getting out, in hard rock, complete all as specified and as directed. excavation over area exc 1.5 mtr deep but n.exc 3.0 mtr and getting out, in hard rock, complete all as specified and as directed. excavation over area n.exc 1.5 m deep and getting out, in soft/disintegrated rock ,complete all as specified and as directed. excavation in trenches not exceeding 1.5 mtrs. wide and not exceeding 1.5 mtrs. in depth for foundation, laying of cables etc and getting out, in hard/dense soil complete all as specified. excavation in trenches not exceeding 1.5 mtrs. wide and not exceeding 1.5 mtrs. in depth for foundation, laying of cables etc and getting out, in soft/disintegrated rock complete all as
Sector: Defense