Description: Total Station Survey and Fixing of Boundary stone Work Name Conducting Preliminary Investigation Total Station Survey and Soil Investigation works for various budget works works under working group and works under one Panchayath One Play Ground Scheme Construction of Indoor stadium Turf Ground in 7 Grama Panchayath in Dharmadam LAC Total Station Survey Fixing of Boundary stone
Details: Total Station Survey 56.12.a : Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval. 56.13 : Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation,bridge and building sites at in accessible locations) Fixing of Boundary Stone 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil 16.22 : Providing and fixing 15x15x90 cm boundary
Sector: Sports