Details: 1.site clearance and dismantling 2.3.2.a:clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness in area of light jungle - by mechanical means 2.4.2.a:dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres cement concrete grade m-15 & m-20 - by mechanical means 2.4.2.b:dismantling of existing structures like culverts, bridges, retaining walls and other structure compr
Sector: Road development