Details: construction of peb 2 superstructure 10.16.1steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. hot finished welded type tubes{rigid portal frames, stanchions, columns,overhead crane structure, beams, girders, bracing etc with hot rolled steel sections and ms plates confirming to is 2062 - 2006 including hoisting upto a height up to 5m above ground level and fixing in position including surface preparation by shot blasting followed by a coat of approved epoxy zinc phosphate primer (dft not less than 30 micron) all complete as per approved structural drawings, as per particular specifications ,cpwd specifications and direction of engineer-in- charge.} 10.25steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a p
Sector: Livestock