Details: mobilisation including transportation of all necessary plant& equipments of materials of boring, field testing andsampling and demobilisation after completing the work.for machine boring per set2 setting up boring rig at each bore hole locations includingcarrying all necessary plant, equipment and materials ofboring and field tests and collection of samples at each borehole location.for machine boringper borehole3 boring with rotary power drilling equipments in all(a) all types of soil having n value less than 50 excludinghard rock, soft rock or medium rock for starter upto10m including conducting necessary spt andrecovery of undisturbed soil samples at 5m intervalsfor ordinary soil per meter(b) for next 10m - do - upto a depth of 20mfor ordinary soil per meter(c) for next 10m upto 30m for ordinary soil per meter(d) above 30m for ordinary soil per meter24 conducting standard test in bore hole at anydepth. per each5 recovering disturbed sample and preserving the same in airtight sampl
Sector: Municipality