| Tender Title |
Sustainability Support to Community Managed Water Supply Schemes - 2025-26 - Morayur Gramapanchayath - Malappuram Dist |
| Tender Description |
appendix-a -tippusulthan wss pipeline workssupply of pvc pipe, 10kg/cm2, 20mm dia. supply of pvc pipe, 10kg/cm2, 25mm dia supply of pvc pipe, 10kg/cm2, 32mm dia. supply of pvc pipe, 10kg/cm2, 40mm dia. supply of pvc pipe, 10kg/cm2, 50mm dia. supply of pvc pipe, 10kg/cm2, 63mm dia. supply of pvc pipe, 10kg/cm2, 75mm dia. excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil |
| Comments |
appendix-a -tippusulthan wss pipeline workssupply of pvc pipe, 10kg/cm2, 20mm dia. supply of pvc pipe, 10kg/cm2, 25mm dia supply of pvc pipe, 10kg/cm2, 32mm dia. supply of pvc pipe, 10kg/cm2, 40mm dia. supply of pvc pipe, 10kg/cm2, 50mm dia. supply of pvc pipe, 10kg/cm2, 63mm dia. supply of pvc pipe, 10kg/cm2, 75mm dia. excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil |