Details: road 3.2 : preparation of foundation for embankmentscarifying existing bituminous surface to a depth of 150 mm by mechanical meansscarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 3.5.1 : excavation in cutting in soil by manual means with lead upto 50 mexcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 4.1.a.1 : granular sub-base with well graded material (table 400.1) (a) by mix in place method construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. (i) for g
Sector: Power Sector