Details: loading lt psc pole from the stacking place and unloading the same at work site (transport by vehicle). additional rate for refitting/redoing one shackle set and reshackling one span while renewing any type of pole. additional rate for excavation of pit for a type pole in hard laterite. loading ht a type pole from the stacking place and unloading the same at work site (transport by vehicle). providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). dismantling one damaged lt psc/rcc pole after disconnecting stays, strut etc. and stacking the same. dismantling (without damage) one lt psc/rcc pole after disconnecting stays, strut etc. and stacking the same. dismantling (without damage) lt stay incl. digging pit in all classes of soil and backfilling transferring lt sph 2/3 wire oh line to newly erected ht/lt pole and refitting all items to the new pole. transferring lt 3ph 4/5 wire oh line to newly erected ht/lt pole and refitting all items to
Sector: Power Sector