Details: laying and jointing pvc pipe. heading renewal of existing damaged/old lt stay with newstay in place and refitting of all items and conveyance of all materials. transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading insertion of one lt psc pole in existing 3ph oh line incl.digging & back filling pit, fitting cross arm, insulator,binding etc. loading lt psc pole from the stacking place and unloading the same at work site (transport by vehicle) reconductoring one km ltsph 2 wire oh old line with new acsr rabbit conductorincl. conveyance of materials dismantling (without damage)one km lt 3ph 4 wire oh line,cross arms, insulators and stacking the conductors in rolls dismantling (without damage) one km lt additional conductor line, cross arms,insulators and stacking the conductors in rolls fitting one no. section fuse on lt line with dropping cables,crimping sockets, connecting with bolt&nut etc insertion of one lt psc pole in exi
Sector: Power Sector