Details: app.a renovation of pond 60.2.3 : bailing out water using pump above 5 hp and up to 10 hp-bailing out water with engine and pump set above 5hp and up to 10hp, including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 2.17.2 : close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (measurements to be taken of the face area timbered).depth exceeding 1.5 m but not exceeding 3 m 2.6.1 : earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od26683/2024_2025 : dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness
Sector: Infrastructure