Details: demolishing works for erecting steel column dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. for thickness of tiles 10 mm to 25 mm. atrium covering at the first floor level structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. as per drawing steel work in built up g i tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. as per drawing painting with synthetic enamel paint of approved brand and manufacture to give an even shade: two or more coats on new work providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less th
Sector: Medical Education