Details: earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (ss20b) providing, laying & jointing of hdpe pipe pe 100 conforming to isi 4984/2026 standard and suitable for the respective working pressures with all fittings and accessories e.g. couplings, tees, bends, reducers, adapters, flanged tail pieces etc. jointing as per manufacturers' instruction,etc. item complete. 250mm-6 kg/cm2 providing, laying & jointing of hdpe pipe pe 100 conforming to isi 4984/2026 standard and suitable for the respective working pressures with all fittings and accessories e.g. couplings, tees, bends, reducers, adapters, flanged tail pieces etc. jointing as per manufacturers' instruction,etc. item complete. 140mm-6 kg/cm2 providing, laying & jointing of hdpe pipe pe 100 conforming to isi 4984/2026 standard and suitable for
Sector: Municipality