Description: CONSTRUCTION OF GIRLS STUDENTS STUDY CENTRE IN FIRST FLOOR AT AC RI CHETTINAD SIVAGANGAI DISTRICT Name of Work Construction of Girls Students Study Centre in First floor at AC RI Chettinad in Sivagangai District
Details: EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc., complete complying with standard specifications. Supplying and filling in foundation and basement and trenches with FILLING M.SAND in layers of not more than 15cm thick, well watered, rammed and consolidated complying with standard specification etc., complete as directed by the departmental officers. PLAIN CEMENT CONCRETE 1:5:10 (One cement, five M. sand and ten aggregate) using 40 mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thi
Sector: Agriculture Misc