The TNEB Limited has published a tender for "ECHP-II- Loading of 100 mtrs. SH belt at Central Stores TTPS with specification f 1800mm BW 5 ply, 5 3, 1800 KN N, Nylon Nylon and transported to Conveyor-72 and erected in Conveyor-72 for replacing the damaged belt" on the 02 Dec 2025. This tender belongs to Conveyor Belt category. This tender is published in Thoothukkudi, Tamil Nadu location. The vendors interested in this tender and related Conveyor Belt tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: conveyor belt Tenders | conveyors and accessories Tenders | chute installation Tenders
Related categories: Conveyor roller Tenders | Return rollers Tenders | Conveyor feeders Tenders |
In Thoothukkudi district, Tamil Nadu, a total of 59 Conveyor Belt tenders have been published, with 11 tenders released last quarter.
| Tender Title | ECHP-II- Loading of 100 mtrs. SH belt at Central Stores TTPS with specification f 1800mm BW 5 ply, 5 3, 1800 KN N, Nylon Nylon and transported to Conveyor-72 and erected in Conveyor-72 for replacing the damaged belt |
|---|---|
| Tender Description | loading of sh conveyor belt about 100 mtrs belt drum from central stores/ttps to conveyor 72 head end area transporting and unloading at conveyor-take up area- including t&p hire charges and cost of consumables. charges for unloading counter weight from counter weight 30-40 ton capacity box arranging chain block and belt clamps, lifting counter weight box to the required level and after completion of belt joint work, releasing the counter weight box loading the counter weight in all conveyors. (for higher counter weight capacity and take-up tower height) assembling of belt drum stand with necessary supports and stiffness providing at conveyor-72 take up area and unloading the belt drum in the stand. transporting the belt clamps, chain blocks and special tools and spanners to workspot and return back after completion of work. dismantling the fluid coupling end disc cuping springs by releasing all bolts & nuts in primary and secondary drives including t&p hire charges and cost of consum |
| Comments | loading of sh conveyor belt about 100 mtrs belt drum from central stores/ttps to conveyor 72 head end area transporting and unloading at conveyor-take up area- including t&p hire charges and cost of consumables. charges for unloading counter weight from counter weight 30-40 ton capacity box arranging chain block and belt clamps, lifting counter weight box to the required level and after completion of belt joint work, releasing the counter weight box loading the counter weight in all conveyors. (for higher counter weight capacity and take-up tower height) assembling of belt drum stand with necessary supports and stiffness providing at conveyor-72 take up area and unloading the belt drum in the stand. transporting the belt clamps, chain blocks and special tools and spanners to workspot and return back after completion of work. dismantling the fluid coupling end disc cuping springs by releasing all bolts & nuts in primary and secondary drives including t&p hire charges and cost of consum |
| Published Date | |
|---|---|
| Due Date | 17 Dec 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |