The TNEB Limited has published a tender for "Rectification Works to the Air Duct Pedestals in between Bottom Ash Hopper and Mill Bay in Unit 4 area" on the 15 Oct 2025. This tender belongs to Pedestals category. This tender is published in Thoothukkudi, Tamil Nadu location. The vendors interested in this tender and related Pedestals tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: acrylic board Tenders | housing assembly Tenders | ct pt combined metering units Tenders
Related categories: Filling Cabinet Tenders | Desk Tenders | Steel Desk Tenders |
TNEB Limited issued 12 tenders for Pedestals last year
With, 0 floated just last month.
| Tender Title | Rectification Works to the Air Duct Pedestals in between Bottom Ash Hopper and Mill Bay in Unit 4 area |
|---|---|
| Tender Description | dismantling the existing rcc for the required width & depth as per the instructions of engineer in charge and disposing the debris 1 km. away from the site including cost of all materials, labour, lead, lift, etc. complete. labour charges for cutting, welding, fabrication & laying in position of the ms boiler tubes / ms plates including cost of labour charges, cutting, fabrication charges, lead, lift, etc., complete. (m.s scrap will be supplied by dept. at free of cost). providing shuttering arrangements for placing concrete using steel members and wooden props including cost of all materials, lead, lift, etc, complete. supplying fabricating and fixing in position of rts rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. providing rcc 1:1.5:3 using op cement with 12mm to 20mm machine crushed hbg metal including cost of all materials, labour, lead, lift, curing, etc. complete - |
| Comments | dismantling the existing rcc for the required width & depth as per the instructions of engineer in charge and disposing the debris 1 km. away from the site including cost of all materials, labour, lead, lift, etc. complete. labour charges for cutting, welding, fabrication & laying in position of the ms boiler tubes / ms plates including cost of labour charges, cutting, fabrication charges, lead, lift, etc., complete. (m.s scrap will be supplied by dept. at free of cost). providing shuttering arrangements for placing concrete using steel members and wooden props including cost of all materials, lead, lift, etc, complete. supplying fabricating and fixing in position of rts rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. providing rcc 1:1.5:3 using op cement with 12mm to 20mm machine crushed hbg metal including cost of all materials, labour, lead, lift, curing, etc. complete - |
| Published Date | |
|---|---|
| Due Date | 29 Oct 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |