Tender Title |
Repair work to the slab and parapet wall in ash water storage tank of Unit_I and II at NCTPS_I premises |
Tender Description |
nctps –i- cm circle – cm-i- repair work to the slab and parapet wall in ash water storage tank of unit-i & ii at nctps-i premises. chipping of concrete and roughening the surface including cost of all materials, lead, lift, labour charges, etc., complete., and disposing away from site as directed by the engineer at site. dismantling the existing damaged brick work and disposing the debris @ 1 km away from the site as directed by the engineer at site, including cost of all lead, lift, labour charges, t&p etc complete. brick work in cm 1:5 mix using fly ash/column bricks, included cost of all materials, labour, lead, lift, transporting charges, finishing, curing etc., complete as directed by the engineer at the site. providing plain cement concrete pcc 1:2:4, using 40 mm hbg metal as directed by the engineer at site including the cost of all materials, labour, lead, lift, t&p etc., complete. plastering in cm 1:3, 12mm thick including cost of all materials, lead, lift, labour, curing etc |
Comments |
nctps –i- cm circle – cm-i- repair work to the slab and parapet wall in ash water storage tank of unit-i & ii at nctps-i premises. chipping of concrete and roughening the surface including cost of all materials, lead, lift, labour charges, etc., complete., and disposing away from site as directed by the engineer at site. dismantling the existing damaged brick work and disposing the debris @ 1 km away from the site as directed by the engineer at site, including cost of all lead, lift, labour charges, t&p etc complete. brick work in cm 1:5 mix using fly ash/column bricks, included cost of all materials, labour, lead, lift, transporting charges, finishing, curing etc., complete as directed by the engineer at the site. providing plain cement concrete pcc 1:2:4, using 40 mm hbg metal as directed by the engineer at site including the cost of all materials, labour, lead, lift, t&p etc., complete. plastering in cm 1:3, 12mm thick including cost of all materials, lead, lift, labour, curing etc |