Details: earth work narrow excavation for foundation in ordinary soil light black cottonm sandy loam and dry silt including shoring strutting, baling (or) pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the dept. officers with initial lead and lift etc.complete. supplying and filling the foundation and basement with stone crusher dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. plain cement concrete 1:4:8 (one part of cement, four part of crushed stone sand (m- sand) and eight part of coarse aggregates) using 40mm size iss hbg metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification providing steel centering and shuttering without
Sector: Municipality