Details: charges for loading and unloading the m.s. i beams, channels, plates & l-angles and transporting the all strctural materials in trolley from stores to work site area including transport and including t&p, cost of consumables etc., charges for fabrication of structural supports by using of m.s. i beams, channels, plates & l-angles in fabrication yard near switch yard. after completion of fabricated work the structural supports fixing in the existing structure position as per the instruction of site engineer including cost of consumables and hire charges for t & p’s etc., charges for providing temporary support to bottom side structure and dismantling the badly worn out m.s structural supports & pipe supports by gas cutting, loading and transporting to central store for devolution the scrap materials, including lead & lift, hire charges for t&p consumables etc., material on contractor's scope :150 x 75 i – beam ismc 65 x 65 x 6 mm thick angle ismc 150 x 75 x 5.7 mm channel m.s. chequered
Sector: Power Sector