Details: dismantling the existing damaged rcc slab including all labour charges desilting the existing drain including all labour charges dismantling the existing damaged cement concrete including all labour charges removing and refixing of precast slab including all labour charges etc complete earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders ss.20b and sand ,silt or other loose soil, wet sand or silt not under water, light black cotton soi, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc complete conveying the excavated earth upto a distance of 15m distance inclduing all labour charges etc complete plain cement concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates)using 40mm size iss hbg metal inclduign cos an
Sector: Municipality