Details: earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications. ss 20 b providing and laying, spreading and compacting graded stone aggregates to wet mix macadam 250mm thick specification including premixing the materials with water at omc in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base/ base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of morth centering for sides and soffits of r.c.c. slab surfaces such as beams, lintels roof slabs and sunshades including cost and conveyance of all materials to si
Sector: Municipality