Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 plain cement concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size iss hbg metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential char supplying and errecting of steel centring for sides and soffits including supports and struting complete upto 3.29m height and plane surfaces such a rcc slabs rectangular beam,tee or ell beam lintels , bed blocks, staircase waist and landing beams, canopy etc., wi
Sector: Municipality