Details: charges for dismantling and fixing of m.s rubber lined pipes 200 nb pipe in ash water pump house line from 0 meter to 25 meter elevation. charges inclusive cost of consumable, t&p hire charges charges for fabrication and of worn out structurals supports replacing in low pressure water pump discharge line of unit –i, ii & iii including all consumables and hire charges for t&p’s etc cleaning & painting of low pressure pump discharge pipe lines, steel structural supports of unit –i, ii & iii of ash water pump house, one coat of red oxide painting & two coat of enamel painting including cost of paint, consumables, painting brush and cotton waste
Sector: Power Sector