Details: clearing heavy jungle on the both flanks of the dam, inbetween krishna nair diversion weir to interconnecting channel near glenmorgan old forebay and disposed away from site including cost of all materials, labour ,lead lift , etc complete. cutting and removal of vegetative debris on the approach to earthen bund and left flank approach to dam and disposed away from the site as per the directed by the engineer in charge of the works as per technical specification including cost of labour, hire charges etc,. complete. earth work excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains of approach road to dam, ib old forebay toilet leveling and around of glenmorgan camp area in accordance with the specifications and the lines, grades for spreading and making up the berms using side pit earth as per ss20b as directed by the engineer in-charge. providing and laying, spreading and compacting graded stone aggregates
Sector: Power Sector