Description: Replacement of existing HT overhead conductor lines with covered conductor and replacement of old frayed lt Conductor lt bare to LT bare and LT AB cable under revamped Reforms based and results linked distribution sector scheme Name of Work REPLACEMENT OF EXISTING HT OVERHEAD CONDUCTOR LINES WITH COVERED CONDUCTOR AND REPLACEMENT OF OLD FRAYED LT CONDUCTOR LT BARE TO LT BARE AND LT AB CABLE UNDER REVAMPED REFORMS BASED AND RESULTS LINKED DISTRIBUTION SECTOR SCHEME
Details: 11 KV FEEDER RELACEMENT WITH 99 SQMM COVERED CONDUCTOR 11.0 Mtr. Long Steel Lattice Structure with (65 x 65 x 6 mm) M.S. angle suitable for Covered 99sqmm Conductor including all nuts & bolts complete without arms. 11 KV Class Polymeric Pin Insulator for covered conductor with GI Pin, Nuts & Bolts Metallic Ties (Top / Side) for 11 KV Class Polymeric Insulator 11 KV Polymeric Tension Insulator, 70 KN with Clamps, Nuts & Bolts 11 KV Class Polymeric Tension Hardware with Clamps, Nuts & Bolts Insulating Piercing Connector "T" joint tap off with Busbar NDS-Silicon / Surge Arrestor 11 KV Tension Mid Span Jointing Kit for Covered Conductor 11 KV Termination Kit for Covered Conductor Covered conductor 99 Sq. mm. G.I. Wire 4 mm (8-SWG) for Continuous Earth PG Clamp for 99sqmm Conductor M.S.channel 75X40X6mmX2.2 m long for DP. Back clamps of 75x8mm M.S. flat for holding channel. M.S. nuts & bolts of 16mm dia.X 40mm length. M.S. channel 75X 40X 6mm 1.8 m long for S.P.structure. Pole top channe
Sector: Power Sector