Details: earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sq.m on plan) including disposal of excavated earth lead upto 50 m and for cross drain rubble packing with hard laterite stone under floors including watering ramming and consolidating providing & laying cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded granitic orbasaltic stone aggrt. 20 mm. nominal size)excluding cost of centering, shuttering and finishing in in retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. centering and shuttering including struttings,propping etc. and removal of formwork for :
Sector: Municipality